Customization: | Available |
---|---|
After-sales Service: | Get The Solution of Technical Problem Within 1 Day |
Warranty: | 1 Year-Mechanical Parts, 2 Year-Controller |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1. QC report |
2. Machine operation manual |
3. Foundation drawing |
4. Precision testing report |
5. Machine circuit manual |
6. Controller operation manual |
7. CE certification |
Spindle Torque | 699/1520 with gearbox |
X/Y/Z fastest feed speed | 48/48/48m/min |
X/Y/Z cutting feed | 1-10000mm/min |
Max tool dia. | Full: 110mm, empty: 200mm |
Max.tool length | 400mm |
Max. tool weight | 18kg |
Optional configuration | Fagor linear scale for 3 axes 20bar CTS with filter device ZF gearbox 600L coolant tank |
Accessories | Spindle oil chiller Rigid tapping Automatic power off switch 3 colors alarm light LED working lamps Cooling system Automatic micro lubrication for linears and screws Separate handwheel/ MPG Electric box heat exchanger Fully enclosed sheet metal Tool kit Around spindle coolant and compressed air Leveling screws & pads Compressed air blow out through spindle Chips disc & water tank Back flush chip conveying Water gun and compressed air gun 3 axes screw and linear covers Ethernet interface USB & CF card interface Transformer 10.4 screen LCD Chain type chip conveyor * 1 & screw type chip conveyor * 2 4 axes interface |
1. Transportation:
By sea with 1x 20" FR container.
2. Delivery time:
Within 80 days after receiving the prepayments.
3. Payment terms:
30% T/T in advance, 70% after inspection before shipping.
4. Warranty:
12 months non-human made damage for mechanical parts and 24 month non-human made damage for NC controller since customer receiving the machine.
5. Engineer Travel, Installation and commissioning expenses:
The round-trip tickets, accommodation and labor cost are all offered by buyer.
6. Installs debugs the personnel and days:
Approx.3 persons, within 7 days (depends on the actual situation).
7. More functions and machine size can be customized according to customer's requirements.